Objective:
To establish a career in telecommunications this could utilize my knowledge
and expertise in my field of specialization and further enhance my potentials in
Networks
Work and Experience:
Project: Warred Long Haul Optical Fiber Cable Survey
Company: ESS
Main Contractor: Frontier Works Organization
Skills offered:
- Survey of almost all the Punjab Division for laying the Optical Fiber Cable
- Creation of diagram with hurdle such as bridges, canals , sandy areas & so on
Phase II, III & IV in Pakistan: BTS Installation and configuration
Worked by: As T.I Engineer (from July 01, 2005 to
January 01 2008).
Company: Hayat Communication Kuwait
Main Contractor: Nokia Pakistan
Wander: Telenor Pakistan
Skills offered:
- Handling the quality issues for Nokia Ultrasite Indoor and outdoor installation, Configuration, integration, Troubleshooting, alarm testing and EDGE configuration on BTS Site.
- Handling the quality issues for Nokia Ultrasite Indoor repeater sites Installation, Configuration, integration, Troubleshooting and alarm testing.
- Handling the quality issues for Nokia metro site installation, configuration and site survey with TEMPT software installed on PC for before installation and after installation.
- Handling the increased capacity installation and configuration on running site for Nokia Ultrasite Indoor and outdoor sites with different configuration such as 2/2/2, 2/4/2, 2/3/4, 1/2/3, 1/1/4, etc for 900MHz the same as for 1800MHz for single antenna as well as for dual band antenna.
- Handling the GSM management software (Nokia BTS manger, Nokia HW Configurator, Nokia hopper manger) for Testing, Commissioning, Troubleshooting, Configuration and Alarms Testing.
- Handling the M.W. Nokia Flexi hopper Testing, Commissioning, Configuration, integration and Troubleshooting.
- Experienced with various test tools such as Power meter (Bird 43), frequency counter (Agilent 53131A), GPS (Garmin 12XL) and site master (S133A).
- Handling all the Documentations required (Flexihopper SSD, SMR, TI_BoQ, Ultrasite_SSD, Antenna system SSD and BTS Files).
Phase I Pakistan: BTS Installation & MW configuration
Worked by: As T.I Engineer. (From January 02, 2008 to
August 02 2009).
Company: Comsys (PVT) Ltd
Main Contractor Alcatel
Wander: warid telecom
Skills offered:
- Handling the quality issues for Alcatel Ultra site Indoor and outdoor installation.
- Handling the M.W. ALCATEL, version 2.0.2, 2.0.3, 2.0.4, 2.0.5, 2.1.0, Configuration and Troubleshooting.
- Handling all the Documentations required (Alcatel provisional acceptance test form, installation manual form, and sweep test report form).
- Site acceptance
Project: Testing phase for MALC DSLAM with Reach
downlink card up to 12 km
Worked by: As Network Engineer
Company: PTCL
Main Contractor: PTCL
Sub contractor: Comsys (PVT) Ltd
Skills offered
- Uplink & downlink Configuring of MALC DSLAM on co-location site
Installation, configuration, Testing & troubleshooting of DSL modem/CP on customer site
Project: Access network for DSL data, POTS voice & aggregation
network within NGN network
Worked by: As Network Engineer
Company: PAF (Pakistan Air Force)
Main Contractor: Premier (PVT) Ltd
Sub contractor: Comsys (PVT) Ltd
Skills offered:
- Physical Installation & management of indoor & outdoor cabinets, Talco & 100 pairs VF cables, DSLAMs, rectifier, battery bank, tag blocks, AC sensor, DC sensor, temperature sensor, humidity sensor, smoke sensor, sensor controlling Device & sun server
- General/Global configuration of ZHONE IP DSLAM such as creation of profiles for enabling cards, configuration of IP interface for remotely management, up gradation of software images through TFTP, creation of DNS client profile, creation NTP client profile & so on
- Integration of IP DSLAM (ZHONE) with BRAS (Cisco 7200 router) as well as configuration, management, testing & troubleshooting of ADSL2+ data within DSLAM in case of data
- Integration of IP DSLAM (ZHONE) with soft switch (HUAWEI softx3000) as well as configuration, management, testing & troubleshooting of voice within DSLAN in case of voice over IP with MEGACO protocol
- Configuration of uplink over DSLAM with Trunk link configuring three VLAN (voice, data & management)
- Configuration, testing & troubleshooting of CPE (ZYXEL or ZHONE modem) with routing & switching mode
- Configuring, testing & troubleshooting of Cisco 3500 series layer three switches with managing intra VLAN routing & switching, playing OSPF protocol
Project: Altai A8 WiFi Cellular Base Station
Worked by: As Network Engineer
Company: Mobilink House 1- A, Kohistan Road, F-8 Markaz, Islamabad,
Pakistan & so on
Main Contractor: Comsys (PVT) Ltd
Skills offered:
Physical installation
- Site commissioning
- Walk test for signal availability & strength
Project: Access network with ATM DSLAM
Worked by: As Network Engineer
Company: NTC
Main Contractor: Comsys (PVT) Ltd
Skills offered:
- Physical installation of Talco & 100 pairs VF cables, 19 inch rack, DSLAM, external splitters, rectifier, battery bank, tag blocks, E1 crown block
- General/Global configuration of ZHONE ATM DSLAM such as creation of profiles for enabling cards, configuration of IP interface through ATM switch for remotely management, up gradation of software images through TFTP, creation of DNS client profile, creation NTP client profile & so on
- Configuration, management & troubleshooting of DSL data within ZHONE ATM DSLAM
- Configuration of ATM cross connect between uplink & downlink
- Configuration of uplink with IMA mode
Project: ISP installation and configuration
Worked by: As Network Engineer
Company: SCO
Main Contractor: Comsys (PVT) Ltd
Skills offered:
- Physical installation of ISP devices such as servers, routers, DSLAM, firewall, switches & so on
- Configuration, testing & troubleshooting of ZYXEL IP DSLAM
- Configuration of routers' (Cisco, Image stream) FE, GE, serial interfaces with playing OSPF
- Initial installation & configuration of cache server, web server, mail server over FreeBSD operating system
- Configuration of E1 TO FE converter (E1 Extender) & Fiber optic to FE converter (E1 extender)
Project: GPON over ZHONE DSLAM
Worked by: As Communications Engineer
Company: Emirates Telecommunications Corporation - Etisalat
Main Contractor: ZHONE Technologies
Sub contractor: Comsys gulf communication services (Dubai)
Skills offered:
- Physical Installation of cabinet, MSK chassis & management of 64 Optical Fiber cables from MSK chassis to Optical splitter
- Testing/power measurement of Optical fiber cables with optical power meter
Project: Etisalat modem software up gradation
Worked by: As Communications Engineer
Company: Emirates Telecommunications Corporation - Etisalat
Main Contractor: ZHONE Technologies
Sub contractor: Comsys gulf communication services (Dubai)
Skills offered:
- Software up gradation of three thousands of Etisalat modem/CP
Project: BTS installation & MW installation+commissioning
Worked by: As site supervisor
Company: du (Dubai)
Main Contractor: Hayat Communication Kuwait
Sub contractor: Comsys gulf communication services (Dubai)
Skills offered:
- Physical installation of indoor & outdoor 2G cabinet, rectifier cabinet, Battery bank, power cables, grounding cables, alarm cables, jumper cables, feeder cables, 2G antenna (single & dual band), MW dish (0.3, 0.6 ,1.2 ,1.8 ,2.4), labeling, tagging & so on
- Commissioning of MW Units (Hauwaei RTN, Nokia Flexi Hybrid) & panning of MW dish
- Site acceptance
Currently working: Eastern Lather Company (PVT) Ltd
Worked by: As a Network Administrator
Skills offered:
Extra working on:
- E1 to Ether converter
- Fiber to Ether converter
- 24 pots PBS
Training: BTS Technical Implementation (from January
19, 2007 to January 20, 2007)
Training: WATEEN wireless modem configuration and
Installation at user end
Education & Credentials
B.S.C from university of Punjab
F.S.C from university of Sargodha
Technical Certifications:
Cisco Certifications:
CCNA Discovery: Networking for Home and Small Businesses
CCNA Discover: Introducing Routing and Switching in the Enterprise
CCNA Discover: Working at a small-to-Medium Business or ISP
CCNA Discover: Designing and Supporting Computer Networks
CCNA Security
Cisco Certified Network Associate
Varification:
Registration ID: 249573355
Validation ID: 804979331
Certificate Verification No. 411054171245CKYM
Cisco Certified Network Professional (ccnp) Training
CCIE Routing and Switching In progress
Microsoft Certificates:
Microsoft Certified IT Professional
Microsoft Certified IT Professional + Exchange 2012 Training
References will be available on request.
Date of birth: 08-05-1981
Adress: House no 12, Block no 30, Sargodha
Nationality: Pakistani
Mobile No: +92-03345953196
Residence No : +92-048-3713948